VDOT, Odd Fellows Road Interchange at U.S. Route 29/460

Construction at Odd Fellows Road Interchange at U.S. Route 29/460

MBP provided quality assurance management services during the design and construction phases; and quality assurance inspection and testing, and project records management services during the construction phase. The project consisted of the construction of a new diamond interchange for Route 29/460 and Odd Fellows Road. Project elements included a new bridge over a divided highway,… Read More

VDOT, Zion Crossroads

Aerial view of Zion crossroads

MBP provided construction phase quality assurance services on the Zion Crossroads project. This design-build project was located at the interchange of Route 15 and I-64 with the purpose to improve traffic operations and increase safety at the interchange and along Route 15. Improvements made included reconstruction of approximately 0.63 miles of existing roadway to accommodate… Read More

Virginia State University, Lockett Hall

Exterior of Lockett Hall

MBP provided full-time, on-site project management services for Virginia State University’s Lockett Hall. The project involved a full building renovation and the addition of a new passenger elevator and entrance feature at the west end of the two-story portion of the building that was built in the 1930s to first serve as a creamery for… Read More

Virginia Tech, Boiler #12 Replacement

Boiler 12 at Virginia Tech

MBP provided project management and commissioning services. The project consisted of two phases of construction with phase one focusing on the demolition and removal of an existing boiler, modifications to the existing plant structure, and changes to the office, lounge, and workshop areas. Phase two consisted of the installation of new structural members to fortify… Read More

Virginia Tech, Center for the Arts/Creative Technologies

Center for the Arts/Creative Technologies at Virginia Tech

MBP worked as an extension of staff to Virginia Tech providing full-time, on-site project management and clerk-of-the-works services. This project included construction of a state-of-the-art, 1,260-seat, performance hall and collaborative performance lab/black box theatre. Additions to the existing Shultz Hall were gutted and renovated. Creative technology laboratory spaces devoted to the Center for Creative Technologies in… Read More

Virginia Tech, Skelton Conference Center

Exterior of Skelton Conference Center at Virginia Tech

MBP provided full-time, on-site project management and inspection services (clerk-of-the-works) on this high-visibility project. The project consisted of a 193,000-square-foot complex that included an alumni center, continuing education center (CEC), and hotel. The alumni center is a 29,000-square-foot, three-level structure used as a museum and auditorium for university memorabilia. The CEC is a 75,000-square-foot, three-level conference center designed… Read More

West Virginia School Building Authority, Johnson Elementary School

Exterior of Johnson Elementary School

MBP provided program management services to include cost estimating, constructibility review, and scheduling. MBP also provided on-site construction management services, inspection, change order reviews, schedule of values review, and commissioning services. The project consisted of the new construction of a 68,000-square-foot elementary school that also included a cafeteria and a gymnasium with seating for spectators.

Williamsburg-James City County Public Schools, Lois S. Hornsby Middle/James J. Blayton Elementary

Aerial view of Lois S. Hornsby Middle School and James J. Blayton Elementary School

MBP provided program management services including oversight of the design development, site selection process, constructibility review, full-time, on-site construction management services, site inspections, utilities coordination, progress monitoring and reporting to school board, CPM scheduling review, payment application review, and cost estimating services. The project, located on a 81-acre site, included the 145,000-square-foot Lois S. Hornsby… Read More

Williamsburg-James City County Public Schools, Matoaka Elementary School

Exterior of Matoaka Elementary School

MBP provided project and construction management services during the award and construction phases of the new 91,000-square-foot, one-story elementary school. Designed for a student capacity of 710 pupils, the school includes a state-of-the-art information technology package with LCD projectors and video on demand in each classroom, wings for each K-5 grade, a gymnasium and cafeteria with a stage… Read More