MBP provided full-time, on-site supervision and project management services.  The project involved the complete restoration of a 180 year-old stone bridge. The double-arched, stone bridge with a humped back was built between 1810 and 1830 when the Snickers Gap Turnpike was being constructed. The bridge was dismantled and reassembled stone-by-stone.