Belleville Power Plant

Wood County, WV

MBP provided dispute resolution services and prepared an as-built versus as-planned CPM schedule delay analysis and determined responsibility for concurrence and compensability of delays. The project consisted of the construction of a hydroelectric power generating station on the Ohio River at the West Virginia (east) end of the existing U.S. Army Corps of Engineers Lock and Dam. The project involved building a two-unit, low head, horizontally positioned, bulb type turbine power generating plant. The structure is a submersed reinforced concrete powerhouse and gravity dam designed to abut the existing concrete dam on the Ohio River.

MBP Insights

Explore Our Blog

Stay informed with the latest insights, lessons learned, and thought leadership from MBP’s experts.

Join Our Team

Be a Part of Something Great

At MBP, you’ll be part of a supportive, collaborative environment where your skills are valued, your growth is prioritized, and your work makes a real impact.