Arlington Public Schools, Reed School/Westover Library

MBP provided pre-construction phase project management services including design and constructibility reviews, cost analyses, LEED review and compliance assistance; and full-time, on-site construction phase project management services including construction oversight, meeting management, change order negotiation, document control, schedule review, and payment application review. The project involved the historic rehabilitation of the original 1938 school building and… Read More

Arlington Public Schools, Washington-Lee High School

MBP provided complete construction management services including pre-construction phase design, constructibility, and cost reviews; LEED assistance; phasing and master scheduling; scope of work, bid alternate, and bid package development; contractor pre-qualification and selection; as well as full-time on-site owner’s representation, inspection, and project management services during construction. The project included a complete re-build of Washington-Lee High… Read More

Caroline County Public Schools, Lewis and Clark Elementary School

MBP provided construction management and commissioning services for the Lewis and Clark Elementary School. This project consisted of a new pre-kindergarten through fifth grade school facility on 22.53 acres with a 950 student capacity. The school is a one-story, 96,900-square-foot building with 4,500 square feet under canopies and covered walkways.

Charlotte-Mecklenburg Board of Education, South Mecklenburg High School

MBP provided commissioning services for the Charlotte-Mecklenburg Board of Education. The South Mecklenburg High School replaced two existing buildings on campus which dated back to the school’s founding in 1958, with a new 57,000-square-foot high school. It also included a lighting retrofit in the existing gymnasium as well as the renovation of the existing cafeteria on campus.

Chesterfield County Public Schools, Beulah Elementary School

MBP provided program and full-time, on-site construction management services, site inspections, utilities coordination, progress monitoring and reporting to school board, CPM scheduling review, and change order and payment application review. The project involved the construction of a new 100,000-square-foot elementary school with a design capacity for 900 students. The one-story brick veneer school includes three… Read More

Chesterfield County Public Schools, Enon Elementary School

MBP provided program and full-time, on-site construction management services, site inspections, utilities coordination, progress monitoring and reporting to school board, CPM scheduling review, and change order and payment application review. The project involved the demolition of the existing 1930 school house and the construction of a new 90,000-square-foot elementary school with a design capacity for… Read More

Cheyney University, Carver Science Building

MBP provided commissioning services during the construction, training, warranty/post-acceptance, and final document phases. The new facility replaced an existing building and provides a new 53,000-square-foot science and classroom building. It was constructed in a single phase and includes office space, science and research laboratories, smart classrooms, a digital planetarium, and an amphitheater. This project achieved… Read More

College of Charleston, Rita Hollings Science Center Renovation

MBP provided agency construction management services during the pre-construction and construction phases including full-time, on-site construction management, cost estimating, and constructibility reviews. MBP also provided commissioning services for the complete renovation and addition of the facility. The project consisted of a full renovation of the approximately 100,000-square-foot science and classroom building, addition of a 35,000-square-foot auditorium,… Read More

College of William and Mary, Integrated Science Center

MBP provided commissioning services on an as-needed basis during the contract term. This project involved the construction of a new 113,000-square-foot addition to the existing Integrated Science Center (ISC) Phase 1 and ISC Phase 2. The project included spaces for applied science, biology, chemistry, psychology, and integrated research. Spaces also include laboratories, classrooms, offices, a lecture… Read More

Dillard University, Katrina Repairs/Enhancements Program

MBP provided program management services including cost management and cost engineering services. Hurricane Katrina caused extensive wind damage and the failure of the London Avenue Canal flooded the Dillard University campus. The canal failure produced massive flood damage to campus infrastructure. The project included renovation and demolition of more than 30 buildings across Dillard University’s… Read More