NCDOT, NCDOT On-Call

MBP provided construction engineering and inspection services for NCDOT on an as-needed, on-call basis throughout the state of North Carolina. All work under this contract is performed in accordance with all applicable guidelines published by the state and in accordance with the scope of work. Projects under this on-call contract included new construction and maintenance… Read More

NCDOT, Yadkin River Bridge

MBP provided dispute resolution services for this design-build project which included the replacement of the bridge that carries I-85 over the Yadkin River, the parallel bridges that cross over the North Carolina Railroad tracks located north of the river, the parallel bridges over the Duke Power Industrial Rail Spur located south of river, and the bridge… Read More

North Carolina Department of Justice, Virginia Dare Memorial Bridge

On behalf of the North Carolina Department of Transportation, MBP reviewed the contractor’s claim for additional compensation and time extension. The Virginia Dare Bridge is a new 8.4 kilometer structure that connects Roanoke Island and North Carolina’s Barrier Islands in Dare County, North Carolina. The project spans wetland areas near the shore on the east and west sides… Read More

ODOT, Cleveland Innerbelt

MBP provided CPM scheduling services to ODOT for phase 1 and phase 2 of this design-build project. The project was part of the Cleveland Innerbelt modernization project and involved the construction of a new eastbound I-90 bridge over the Cuyahoga River Valley. This new bridge replaced the exisiting I-90 non-redundant steel cantilevered deck truss with… Read More

Raleigh-Durham International Airport Parking Garage

MBP performed dispute resolution services including the investigation and technical analysis of disputed issues and delays related to the new 2,700-space, multi-level parking garage and connecting tunnel at the Raleigh-Durham International Airport. Phased construction included two concrete deck structures consisting of slab-on-grade, four supported levels of post-tensioned concrete, two steel vehicular helices, and a covered open-air lightwell… Read More

The Port Authority of New York and New Jersey, George Washington Bridge Rehabilitation Program

MBP provided project controls support services for the George Washington Bridge Rehabilitation Program. The George Washington Bridge is a 85-year-old, double-decked suspension bridge spanning the Hudson River between Manhattan and Fort Lee, New Jersey. Having the highest daily vehicular traffic of any bridge in the world, this 10-year Capital Plan Construction Program invests in 11 state… Read More

VDOT/Loudoun County, Hibbs Bridge Restoration Project

MBP provided full-time, on-site supervision and project management services.  The project involved the complete restoration of a 180 year-old stone bridge. The double-arched, stone bridge with a humped back was built between 1810 and 1830 when the Snickers Gap Turnpike was being constructed. The bridge was dismantled and reassembled stone-by-stone.

VDOT, Battlefield Boulevard/I-64 Interchange

MBP provided complete construction management and inspection services including quality assurance, quality control, maintenance of traffic, erosion and sediment control compliance, and extensive CPM schedule review. MBP worked with the contractor to develop enhancements to the construction phasing which resulted in significant schedule improvement. Prior to construction, MBP developed pre-bid CPM schedules and performed constructibility review… Read More

VDOT, Downtown Tunnel,
Midtown Tunnel, Martin Luther
King Jr. Expressway

As part of the program management team, MBP provided assistance to VDOT with independent review and evaluation of contractual documents prior to VDOT executing the comprehensive agreement with the design-build team. Analysis included cost estimating, review of technical requirements, quality assurance program requirements, and other contractual language. During the design and construction phases, MBP provided… Read More